Phase 9 — Developer / Progress Document¶
Purpose¶
Phase 9 focused on production readiness and trust boundaries: deploying safely, tightening authorization scaffolding, and ensuring the app behaves predictably under production settings.
Deployment¶
- Added deployment-oriented validation using Django’s
check --deploywith production-style environment variables. - Documented Railway runtime expectations and environment configuration in
docs/deployment.md. - Standardized the base template to reference local static assets (
core/app.css,core/app.js) for predictable production serving.
Trust Closure and Permission Scoping¶
- Introduced default auth groups (
player,admin) and assigned model permissions duringpost_migrate. - Ensured new users join the
playergroup automatically on signup. - Used permissions as a coarse capability layer while preserving per-player scoping as the primary isolation mechanism.
Cleanup Outcomes¶
- Consolidated “production boot” expectations into reproducible checks and tests.
- Reduced reliance on environment-specific behavior by making host and origin handling explicit in production configuration.
Notes and Limitations¶
- Group permissions do not replace per-player queryset scoping; both are required for safe behavior.
- Production checks validate configuration but do not validate data correctness or analysis results.